services
Underground power and feeders to shops, barns, detached garages, wells and outbuildings.
Underground Electrical and Feeder Installation
Need power out to a shop, barn, detached garage, well pump, gate or outbuilding? James Sellers Electrical installs underground electrical lines and feeders throughout Union County.
We size the feeder for the load, use the right conduit and burial depth, and install subpanels or disconnects where needed, all to code and ready for inspection.
Every underground run starts with planning. We figure out what you'll power at the far end, how far it is from the panel and what's in the way, such as driveways, septic fields, trees and other buried lines. That decides the wire size, which has to account for voltage drop over long distances, and the type of conduit or cable we use. NC 811 marks the public utilities before we dig, and private lines on your property are worth flagging too.
On install day, we trench to the required depth, lay the conduit or cable, add warning tape above it and backfill. At the building end, we install a subpanel or disconnect with its own grounding, plus the lights and outlets you need. A properly sized feeder lets you run tools, heaters, freezers or a well pump without dimming lights or tripping breakers, and leaves room to add more later. The run is inspected before the trench is closed, so we schedule that inspection around the dig. If you're not sure what you'll want out there in a few years, a slightly larger conduit now makes it much easier to upgrade.
Running power underground keeps your property clean and protects the wiring from weather and damage. We'll plan the best route and handle the job from start to finish.
Related services: Meter Base & Main Service Installation, New Construction Electrical Wiring and Generator Installation & Connections.
It depends on the type of cable or conduit and what's above it, such as a lawn or a driveway. We follow code for burial depth and protection on every run, so it passes inspection and stays protected.
If you'll run several circuits out there, like lights, outlets and tools, a subpanel is usually the best option. For one small load, a single circuit may be enough. We'll size it for what you plan to run.
Yes. Underground utilities must be marked before any digging in North Carolina. We make sure the 811 locate is done before we start.

DISCOVER WHAT OUR CUSTOMERS HAVE TO SAY ABOUT US
REVIEW US ON GOOGLE
Our process is simple and only contains a few simple steps
